Our Facilities

Our Facilities

Our Facilities

Our bottling facilities are located at an altitude of 485m, at the foot of Mount Mitsikeli, in perfect balance with the surroundings.

Integrating and supporting the operation of our two bottling plants, we have established a third plant in the Industrial Area of Ioannina to automate the production of PET packaging materials – preforms and caps. Our packaging materials are manufactured through a careful selection of the best quality of raw material and an installed system that performs ongoing tests on finished products, to keep the water inside the bottle protected, pure and intact.

Our Facilities

Our Facilities

Our bottling facilities are located at an altitude of 485m, at the foot of Mount Mitsikeli, in perfect balance with the surroundings.

Integrating and supporting the operation of our two bottling plants, we have established a third plant in the Industrial Area of Ioannina to automate the production of PET packaging materials – preforms and caps. Our packaging materials are manufactured through a careful selection of the best quality of raw material and an installed system that performs ongoing tests on finished products, to keep the water inside the bottle protected, pure and intact.